ConocoPhillips has resumed its drilling program at the Grace 1 well.
The rig had to be moved last year as a precaution, at the onset of Tropical Cyclone Christine.
Upstream Online [read this story]
ConocoPhillips has resumed its drilling program at the Grace 1 well.
The rig had to be moved last year as a precaution, at the onset of Tropical Cyclone Christine.
Upstream Online [read this story]